Skip to content
LEANODM
Menu
Page Sections

Continuous Improvement

Screen printing drying layout proposal

A March 2021 proposal documented removing two drying lines after switching to fast-drying ink, opening space around the screen printing stations.

The screen printing aisle after the drying lines were removed.
Screen printing drying layout proposal — March 2021
01 / BACKGROUND

Activity background

The screen printing workshop reviewed how drying equipment occupied floor space.

02 / ACTIVITY

What the collection records

The photograph shows the aisle after the drying lines were removed.

03 / RELEVANCE

Relevance to the factory record

The layout provided more space for moving materials within the workshop.

CONNECT THE RECORD WITH YOUR REVIEW

Related factory and company evidence

CONTINUE EXPLORING

Related activity records

All activities
Continuous improvement

Transparent material storage

Clear containers and designated racks make stored parts and tools visible.

5 photos
Continuous improvement

Electric forklift safety training

Xinyinhai’s production team reviewed forklift incident case studies and watched a demonstration of a walk-behind electric stacker.

3 photos · 1 video
Continuous improvement

Employee improvement proposal

A photographed proposal document records an employee contribution to workplace improvement.

1 photo

Image viewer

Zoom stops at the supplied image resolution. Open image file ↗